Industrial Facilities
Engineering-grade moisture and HVAC investigations for warehouses, manufacturing and processing facilities.
WHS Code of Practice compliance. Industrial facility operators carry PCBU obligations under the 2026 Code on biological hazards — including airborne mould exposure, HVAC documentation and post-remediation verification.
Learn about WHS complianceWarehouses and manufacturing facilities face moisture challenges that aren't obvious on the surface — process humidity, condensation from plant and equipment, inadequate ventilation and poor vapour management. Finding the source requires more than a visual inspection.
Why it matters
Industrial moisture is an engineering problem
Warehouses and manufacturing facilities face moisture challenges that aren't obvious on the surface — process humidity, condensation from plant and equipment, inadequate ventilation and poor vapour management. Finding the source requires more than a visual inspection.
Scope
What we assess
- Condensation and dew point analysis
- HVAC and ventilation performance review
- Cold room and refrigeration interface investigations
- Roof and building envelope moisture mapping
- Post-flood and water ingress investigations
- Post-remediation verification
Clients
Who we work with
- Warehouse and logistics operators
- Food and manufacturing facility managers
- Engineering and maintenance teams
- Facility owners and asset managers
- Insurance assessors and loss adjusters
Ready to get a clear answer?
Talk to a ProMould engineer about an assessment for your facility.
